Project: Brooklyn Bridge Park
Location: Brooklyn, NY
Firm: Michael Van Valkenburgh Associates, Inc.
Year: 2010 – Piers 1, Pier 6;
2012—Pier 5;
2013—Pier 2, Pier 3/4 Uplands.
Firm website: www.mvvainc.com
Project Description: Currently under construction, Brooklyn Bridge Park will eventually encompass approximately eighty-five acres and 1.3 miles of waterfront. The park’s goals are both ambitious and straightforward: to preserve the dramatic experience and monumental character of the industrial waterfront while reintroducing self-sustaining ecosystems to the site and investing it with new social and recreational possibilities.
MVVA took a broad mandate of sustainability and applied it across a range of spheres—ecological, structural, cultural, and economic. Sociological diversity, programmatic flexibility, and a robust post-industrial nature are threaded together to create a park that can function both as a metropolitan park on the scale of Olmsted’s landscape infrastructures and as a collection of smaller, nested neighborhood parks.
Brooklyn Bridge Park’s design took on a site with limited access points, a narrow overall width, extreme noise pollution from the adjacent elevated highway, a complex structural waterline condition, and a goal of capturing and recycling stormwater. Excess stormwater is collected from buildings, paved areas, lawns, and planting areas, conveyed into underground tanks, and then cycled and cleansed through rain gardens, supporting a lush swath of rain garden plantings. This runoff collection system, in conjunction with the increased use of water-absorbing lawn and planted areas, dramatically curtails the discharge of stormwater runoff into city systems and lowers the likelihood of combined sewer overflow.
Pier One and Pier Six function as “urban junctions,” entrances to the park that will attract families and individuals on a daily and year-round basis with programs such as playgrounds, picnic tables, benches, areas of accessible natural plantings, a dog run with water, and park concession buildings with restrooms. This first phase of Brooklyn Bridge Park provides vital new social spaces and urban programs while bookending the site and laying the foundation for a continuous waterfront park to grow in between. The salt marsh landscape on Pier 6, sports fields and courts on Piers 2 and 5, a community lawn space on Pier 3, a beach, and other park amenities will come with future phases of park construction.
Project Websites: Brooklyn Bridge Park NYC
An interview with Matthew Urbanski (Places Journal)
Project Team: MVVA, Team Lead, Landscape Architecture / Urban Design
AECOM, Marine & Site Infrastructure
Ysrael A. Seinuk, P.C., Structural Engineering
Nitsch Engineering, Stormwater Reuse Consultant
Maryann Thompson Architect, Architecture for Pier 2 and Warming Hut
Richmond So Engineers , Pier 2 Park Building & Warming Hut Structural Engineering
Domingo Gonzales Associates , Lighting Design
Open , Graphic Design
Pine & Swallow Associates , Soil Science
R.J. Van Seters Company , Water Feature Consultant
Paulus, Sokolowski and Sartor, Park Buildings Architect & MEP